Cart empty

 
Fast, Easy and Affordable PDH Continuing Education for Engineers!

Our Amazing Sales & Support: 888-398-8540

Auxiliary Systems Operation & Maintenance - 3 PDH

Email
This publication provides technical guidance and design requirements for operation and maintenance of auxiliary electric power systems.
No image set
$11.95
Download

mc-auxiliary-power-systems-operation-and-maintenance-fe_na.pdf
Price: No additional charge

Manufacturer: Guyer

This publication provides technical guidance and design requirements for operation and maintenance of auxiliary electric power systems.

Course Outline

1.  OPERATING PROCEDURES

2.  ROUTINE MAINTENANCE

3.  GENERATORS AND EXCITERS

4. SWITCHGEAR MAINTENANCE

5.  LUBRICATING OIL PURIFICATION

Learning Objectives

Upon completion of this course you will:

  • Learn about operating procedures for attended auxiliary power stations;
  • Learn about operation of paralleled and non-paralleled stations;
  • Find out about prime movers and their important maintenance requirements;
  • Learn how to implement a maintenance plan for generator exciters;
  • Find out how to employ a synchroscope;
  • Learn the special factors to consider in operational testing;
  • Learn a checklist for prime mover maintenance; and
  • Learn how to develop a long-term checklist for diesel engines.

Intended Audience

This course is intended for electrical engineers, mechanical engineers and other professional engineers, plant operators and construction managers wanting an introduction to operation and maintenance of auxiliary electric power generating plants.

Benefit for Attendee

This course will give professional engineers and others an introduction to auxiliary power plant maintenance procedures and operational requirements.

Course Introduction

This is an introduction to plant operation and maintenance procedures for auxiliary power generating stations.

Course Summary

After completion of this course you will be prepared to address operational and maintenance procedures for auxiliary power plants.

Reviews

There are yet no reviews for this product.

Login Form

After logging in you will stay logged in for 6 hours. If you encounter any page asking you to login during that time please use the ctrl+refresh trick we explain below the login form to see the actual page. :-)

If you see "invalid token" please hold down ctrl on your keyboard and click the refresh button (an arrow going in a circle two buttons to the right of your "back" button).

 
Thank you very much. Appreciate your prompt response. Have a great day.
Linda
 
That was a quick and complete response to my inquiry!!!!! Thank you.
Roger
 
Thank you again for responding to me on a Sunday.
Paul
 
 
Our PDH is currently accepted in: AL, AK, AZ, AR, CA, CO, CT, DE, FL, GA, HI, ID, IL, IN, IA, KS, KY, LA, ME, MA, MI, MN, MS, MO, MT, NE, NV, NH, NM, ND, OH, OK, OR, PA, RI, SC, SD, TN, TX, UT, VT, VA, WA, WV, WI, WY